Romaineering / Ongoing project

Fusor Project

Inertial Electrostatic Confinement Nuclear Fusor

Project at a glance

A continuing student project in system integration, measurement, and testing. The fusor brings together commercial vacuum hardware, a custom control and acquisition setup, and software developed for the experiment.

My work

Hardware integration, control-panel assembly, signal interpretation, Arduino acquisition, Console development, and experimental review.

Evidence so far

Documented hardware and software, with qualitative vacuum observations. Full run reports and neutron measurements are not published.

Current priorities

Complete as-built records, publish traceable vacuum tests, and validate the high-voltage supply and its measurement chain.

What Is an IEC Fusor?

An inertial electrostatic confinement (IEC) fusor uses an electric field to accelerate positively charged ions through low-pressure gas toward a negatively biased inner electrode, usually a wire grid. The gas is partially ionized: it contains electrons and ions as well as neutral particles. This mixture is a plasma.

The voltage difference between the inner grid and the surrounding chamber or outer electrode accelerates ions inward. Some pass through the grid openings and cross the central region; collisions with other fuel particles can produce fusion. Most particles instead lose energy through other interactions or strike surfaces. A visible glow by itself does not establish that fusion is occurring.

Deuterium and fusion products

Deuterium is an isotope of hydrogen whose nucleus contains one proton and one neutron. When deuterium is used as fuel, the two principal deuterium–deuterium (D–D) reaction branches are:

D + D → ³He + nHelium-3 nucleus and a neutron

D + D → T + pTritium nucleus and a proton

Neutron detection is commonly used to test for D–D fusion because one branch produces neutrons that can be measured outside the chamber. A credible result needs a suitable detector, background measurements, and an assessment of uncertainty and interference. Electrical readings and photographs of plasma are not substitutes for that evidence.

A small conventional gridded fusor consumes substantially more energy than its fusion reactions release. Grid interception, collisions, and other losses prevent it from serving as a net-energy reactor. Its value here is as an experimental platform connecting plasma physics, vacuum engineering, high voltage, instrumentation, controls, data acquisition, and eventual nuclear measurement.

Project evidence: No neutron measurements or demonstrated fusion results are documented on this site. The explanation above describes the device concept.

Reference: University of Wisconsin–Madison · IEC operation · Lawrence Berkeley National Laboratory · Deuterium fusion products

Project Overview

I am developing this IEC fusor as a multi-year engineering project while studying Electrical Engineering Technology. My work brings together vacuum hardware, high-voltage design, analog measurement, Arduino acquisition, browser software, mechanical layout, and experimental testing.

My contribution centers on integrating the subsystems, developing the acquisition and monitoring workflow, comparing instruments, and using tests to understand the behavior of the assembled system. Commercial pumps and gauges provide the underlying hardware; the engineering work is in their interfaces, configuration, measurement, and interpretation.

Development has included changes to the vacuum layout, additional chamber instrumentation, Arduino supply-voltage checks, and software handling of real gauge transitions. High-voltage supply design and its measurement system remain under development. This record separates what is installed or observed from what is still being designed.

VacuumHigh VoltageInstrumentationArduinoLabVIEWWeb SerialData Acquisition
Fusor vacuum assembly in an aluminum frame beside the electrical control enclosure.
Project photograph: vacuum assembly and electrical enclosure. This is one documented configuration; individual component status is described below.
Installed / observed

Vacuum & instrumentation

E1M18 roughing and backing, 255H turbo with EXDC160, two APG-M gauges, and an AIM-S chamber gauge.

Implemented

Control & software

Arduino Uno acquisition and relay interfaces with a separate browser Console. The reviewed software release is 4.4.0.

Under development

High voltage

X-ray-transformer supply architecture and measurements are being developed. The 20–25 kV DC operating goal remains a design target.

Not documented

Fusion evidence

No neutron measurements or demonstrated fusion results are published for this project.

Current System

The chamber is the common physical interface between vacuum, electrical, and measurement work. The vacuum system establishes the gas environment; the high-voltage supply being developed establishes the intended grid potential. Instruments observe the system, while the Arduino and Console carry those observations into a recorded time history.

Vacuum

Evacuates the chamber and removes gas through roughing and turbo stages. Chamber and backing pressures describe different parts of that process.

High voltage

The supply being developed is intended to apply a negative potential to the inner grid. Its interfaces include the feedthrough and planned voltage and current measurements.

Instrumentation

Converts physical behavior into electrical signals: pressure-gauge outputs, turbo speed indication, and supply-voltage monitoring.

Control / DAQ

The Arduino samples analog channels, reports relay states, and exchanges telemetry and control requests over serial.

Software

Fusor Console interprets telemetry, displays status, records runs, and supports analysis. It remains a separate application from this portfolio.

Mechanical

CF joints, valves, viewports, feedthroughs, and support structures establish the physical interfaces and constrain access and layout.

Conceptual relationship of the vacuum chamber, vacuum system, instrumentation, Arduino acquisition, Fusor Console, and data logging. Other subsystems are noted separately.
Conceptual overview · not an as-built connection diagram.

The diagram shows functional relationships. It does not specify valve positions, wiring, protective-earth connections, or a completed high-voltage circuit.

Vacuum System

The vacuum assembly combines an Edwards E1M18 rotary-vane pump with an Edwards 255H turbomolecular pump driven by an EXDC160. The E1M18 handles initial chamber evacuation and then backs the turbo. An oil trap is included in the foreline. Separate chamber and foreline gauges make it possible to distinguish conditions at the experiment from conditions at the turbo exhaust.

Vacuum architecture

  1. Vacuum chamberChamber APG-M and AIM-S observe this volume.
  2. Isolation / high-vacuum pathDefines the connection between the chamber and turbo.
  3. Edwards 255HHigh-vacuum stage, driven by the EXDC160.
  4. ForelineForeline APG-M observes backing pressure.
  5. Oil trapPart of the foreline oil-vapor management arrangement.
  6. Edwards E1M18Rotary-vane backing pump and initial roughing source.
Conceptual gas-flow path during turbo-backed pumping. The chamber roughing/bypass path and exact fittings are omitted; this is not an as-built piping diagram.

Roughing stage

A rotary-vane pump can move the initial gas load toward atmosphere. The E1M18 also keeps the downstream side of the turbo at a suitable backing pressure. Its manufacturer lists a maximum pumping speed of 20.4 m³/h at 60 Hz, approximately 12 CFM, and an ultimate total pressure without gas ballast of 3 × 10⁻² mbar.

Those are pump specifications under stated test conditions. Chamber pressure depends on gas load and the conductance of valves, traps, and connecting pipework, so neither value is a measured performance guarantee for the complete assembly. Foreline pressure with a running turbo is also a different condition from a pump-inlet ultimate-pressure test.

Reference: Edwards · E1M18 / E2M18 instruction manual, A343-10-880 Issue R

High-vacuum stage

The turbomolecular stage transfers momentum to gas molecules and directs them toward its exhaust. It requires a backing pump because it cannot discharge directly to atmosphere in normal high-vacuum service. Excessive foreline pressure reduces the conditions available for compression; pressure and speed therefore need to be considered together.

In this project, the foreline APG-M and turbo speed signal provide that operating context. A START relay indication alone does not show that the turbo has reached speed, and a low chamber indication alone does not establish satisfactory backing conditions.

Pressure measurement

The two APG-M gauges serve the chamber and foreline during roughing and in the overlap with high-vacuum measurement. Pirani gauges infer pressure from gas-dependent heat transfer. Their sensitivity varies with pressure; indications near their lower limit should not be treated as precise high-vacuum results.

The chamber AIM-S uses an inverted-magnetron, cold-cathode discharge for lower pressures. Its voltage-to-pressure relationship is specific to the AIM-S model. Both gauge technologies have gas-dependent responses, so agreement is only meaningful when location, range, gas, and instrument state are considered.

The chamber gauges remain independent channels. I do not average their readings into a single supposedly more accurate value. Their overlap is useful for checking continuity of the pump-down history and identifying when one instrument has ceased to be the primary measurement.

Reference: Edwards · Active Pirani Gauge manual, D021-71-885 Issue J · Edwards · AIM-S / SL / X / XL manual, D146-41-880 Issue J

Documented hardware

Expand a component for its role, status, available specifications, and remaining documentation.

Roughing pump · E1M18Initial evacuation and turbo backing
Installed / project record

The rotary-vane pump removes the initial gas load from the chamber and maintains the backing pressure needed at the turbomolecular pump exhaust.

Component
Edwards / E1M18

Maximum pumping speed, 60 Hz (Pneurop)
20.4 m³/h (approximately 12 CFM)
Ultimate total pressure, without gas ballast
3 × 10⁻² mbar

Manufacturer data describe the pump under specified test conditions. They are not a measured base pressure or effective pumping speed for this chamber.

Reference: Edwards · E1M18 / E2M18 instruction manual, A343-10-880 Issue R

High-vacuum pump · 255HHigh-vacuum stage
Installed / project record

The turbomolecular pump transfers gas from the chamber toward the foreline. The E1M18 supports this stage by pumping its exhaust rather than leaving it exposed to atmospheric pressure.

Component
Edwards / 255H

Pump model is documented in the project record. A complete installed-variant specification and measured chamber pumping speed are not published here.

Turbo controller · EXDC160Pump drive and control interface
Installed / project record

The EXDC160 drives the turbomolecular pump. The acquisition system also monitors its speed-related analog signal alongside pressure and the returned turbo START relay state.

Component
Edwards / EXDC160

Controller wiring and electrical isolation details still require an as-built drawing. Reported START state and measured speed are different quantities.

Foreline Pirani gauge · APG-MBacking-pressure indication
Installed / project record

This gauge observes the foreline between the high-vacuum stage and the backing pump. It provides context for the gas load handled by the E1M18 while the turbo is running.

Component
Edwards / APG-M

The APG-M manual specifies a measurement range of 1 × 10⁻³ to 100 mbar and indications up to atmosphere. Sensitivity and uncertainty vary across the range; a voltage-table endpoint is not an accuracy specification.

Reference: Edwards · Active Pirani Gauge manual, D021-71-885 Issue J

Chamber Pirani gauge · APG-MChamber roughing and overlap indication
Installed / project record

A second APG-M measures at the chamber, allowing its pressure history to be compared with foreline behavior without moving a gauge between locations.

Component
Edwards / APG-M

This remains an independent channel from the chamber AIM-S. A low displayed Pirani value is not sufficient evidence of accurate high-vacuum measurement.

Reference: Edwards · Active Pirani Gauge manual, D021-71-885 Issue J

Chamber high-vacuum gauge · AIM-SInverted-magnetron measurement
Installed / project record

The AIM-S uses a cold-cathode discharge to infer pressure at substantially lower pressures than the Pirani measurement range.

Component
Edwards / AIM-S

The manufacturer lists 1 × 10⁻⁸ to 1 × 10⁻² mbar for AIM-S/SL. The signal must also be in a valid operating state; startup and shutdown are handled separately in the Console.

Reference: Edwards · AIM-S / SL / X / XL manual, D146-41-880 Issue J

Vacuum chamber · 2.75-inch CF assemblyExperimental volume and interfaces
Installed / project record

The chamber uses a six-way CF cross, viewports, a high-voltage feedthrough, and instrument and vacuum connections. The documented layout also includes an approximately 12-inch straight CF section with multiple 2.75-inch CF interfaces.

Component
2.75-inch CF assembly

These are project-reported hardware dimensions, not a verified chamber-volume calculation. The project photograph records one configuration; it is not a complete as-built drawing.

Valves and forelineIsolation, roughing, and backing paths
Installed / project record

The vacuum plumbing allows initial chamber evacuation and a turbo-backed high-vacuum configuration. Isolation allows pressure rise to be observed separately from active pumping.

Valve makes, bore sizes, conductance, and the exact bypass routing are pending an as-built piping drawing.

Foreline oil trapOil-vapor management
Installed / project record

An oil trap is included in the foreline to limit oil-vapor migration from the rotary-vane pump toward the high-vacuum system.

Trap model, media, maintenance record, and removal efficiency are not documented; its presence does not establish an oil-free chamber.

Venting arrangementControlled return toward atmosphere
Arrangement pending documentation

Venting is part of the vacuum-system layout and must be considered alongside pump isolation and pressure monitoring.

The exact vent hardware and piping arrangement remain pending documentation.

Pump-down testing

Pressure versus time shows how evacuation changes as the initial gas load falls. The shape of the curve, time spent in a pressure band, gauge transitions, and turbo behavior are more informative than a single minimum reading. Comparisons need similar starting conditions, valve configurations, and gauge-validity rules.

Rate-of-rise testing

Isolating the chamber from active pumping makes its pressure rise observable. The slope, ΔP/Δt, describes the selected interval. A rising pressure can include external leakage, gas released from internal surfaces, permeation, and gas from trapped volumes. The slope alone cannot identify which mechanism dominates.

With a verified isolated volume and suitable assumptions, volume multiplied by pressure-rise rate can estimate total gas load. A verified chamber volume is not available in this record, so no volumetric leak rate is claimed.

Representative observations

Project notes report the following behavior. These are qualitative summaries of observations, not formal acceptance tests or guaranteed performance. Here, one micron of mercury means 0.001 Torr.

Project observation

Chamber indication

Sub-micron

Reported during high-vacuum operation using the chamber AIM-S.

A project observation, not a calibrated base-pressure specification. A full run file and uncertainty assessment are not published here.

Project observation

Foreline indication

Tens to low hundreds of microns

Representative backing-pressure observations with the turbo operating, depending on test conditions.

Different valve states and gas loads are not equivalent tests. These indications do not establish a pump acceptance limit.

Project observation

Isolated chamber

Rate-of-rise tests performed

Pressure rise after isolation has been used to evaluate chamber behavior.

No formal rate or leak throughput is published here without its source interval, instrument validity, and configuration.

Current limitations

Chamber condition, recent exposure to atmosphere, surface contamination, and outgassing can change pump-down and isolated-rise behavior. A slow pump-down is not by itself proof of a leak. Further comparisons need documented starting conditions and source runs; the as-built piping layout and measurement uncertainty also remain to be completed.

How the data is evaluated ↗

High Voltage

The high-voltage work is based on an X-ray transformer with two high-voltage secondary sections and a center tap. The intended rectified output is negative at the inner grid. The table separates existing hardware, project-reported ratings, and design work; it does not represent a commissioned supply or an operating procedure.

High-voltage development record
ElementEvidence / statusPurpose and constraint
X-ray transformerExisting hardware / supply developmentTwo high-voltage secondary sections with a center tap form the basis of a supply intended to deliver negative DC. A complete as-built power circuit is pending.
Primary voltage controlDesign architectureVariac-based adjustment and a proposed step-down stage control primary excitation. Final step-down selection and installation are not established here.
Rectifier and ballastDesign in progressHigh-voltage diode strings provide rectification; ballast resistance is included between the rectifier and fusor. Final string arrangement, assembly, and load validation remain to be documented.
HV feedthroughProject-reported component ratingApproximately 30 kV. This component rating constrains the design; it does not establish a validated voltage rating for the assembled system.
Operating voltageDesign targetApproximately 20–25 kV DC magnitude, negative at the inner grid. 30 kV is an upper design constraint rather than the normal operating target. Sustained operation at this target is not documented.
Voltage divider / current shuntPlanned measurementA high-resistance divider and low-side current shunt have been considered in the design. They are not presented as commissioned channels or completed calibrations.
Insulation and oil enclosureMechanical / electrical design workDielectric-oil immersion, spacing, and mechanical support are part of the insulation approach under development. Final material compatibility and assembled insulation performance remain unverified.

Why these stages are needed

Primary control and rectification. Adjustable primary excitation allows the transformer input to be controlled. A step-down stage has been considered to obtain a useful adjustment range. Diode strings then convert the secondary AC into the intended DC polarity. Reverse-voltage margin must account for the circuit waveform, transients, and unequal voltage sharing within a series string; adding diode ratings alone does not validate the assembly.

Ballast and measurement. Plasma loading can change sharply. Series ballast is included to limit current and moderate the interaction between the supply and discharge, with voltage drop and heat dissipation as design costs. Voltage and current measurements are needed to distinguish supply behavior from load behavior. A divider or shunt value alone does not establish a calibrated, safely insulated measurement chain.

Insulation and mechanical layout. Clearances, surface paths, terminations, stored energy, and dielectric materials constrain the assembly. Oil immersion is part of the design work, but it does not by itself validate the insulation or remove the need to assess the complete arrangement. The feedthrough rating is one component limit; the assembled system may impose a lower limit.

Current evidence boundary: The 20–25 kV DC goal is a design target. A complete supply schematic, sustained-load results, divider/shunt calibration, and radiation measurements are not published here. Software status indications do not certify electrical or radiation safety.

Instrumentation

The measurement chain begins with an instrument, not with a pressure number on a screen. A sensor produces an analog signal; the input interface scales it for the Arduino ADC; firmware converts the sampled result into telemetry; the Console evaluates validity and converts the received signal into an engineering value.

Measurement flow from sensor through signal conditioning and Arduino to serial telemetry, Fusor Console, and logging and analysis.
Conceptual overview · not an as-built connection diagram.

Three different kinds of value

Raw ADC code

The digital count obtained at the microcontroller input. It is tied to the ADC reference and the conditioned input voltage. It is useful during firmware and signal-chain checks, but is not transmitted in the reviewed seven-field production packet.

ADC and sensor voltage

ADC voltage refers to the scaled input at the board. Gauge voltage is reconstructed after divider compensation. The Console receives this reconstructed signal voltage; it is not a direct measurement of plasma voltage.

Engineering value

Pressure or speed is calculated from the received voltage and the configured conversion. The conversion must preserve model, units, calibration settings, and invalid or out-of-range states.

State and validity

Vcc, packet freshness, gauge lifecycle, and returned relay bits provide context. A numeric signal can be present even when a valid pressure measurement is unavailable.

Arduino supply and ADC reference

With the Uno ADC referenced to its supply, a fixed input occupies a different fraction of full scale when Vcc changes. Converting counts with an assumed 5.000 V reference can therefore introduce a voltage error. Divider compensation and the gauge conversion then carry that error into the reported engineering value.

I have investigated the effect of the Arduino 5 V rail on the measurement chain. Internal Vcc monitoring helps interpret readings and compare them with external voltage checks. The reviewed firmware/Console contract uses measured Vcc in the firmware conversion, so the browser must not apply that compensation a second time. An internal-reference estimate still has its own uncertainty and is not a substitute for documented calibration.

Acquired channels

Seven-field telemetry in the reviewed Console release
Field / channelReceived valueInterpretation
1 · Foreline APG-MGauge output voltageForeline pressure through the APG-M profile; conditioned on signal validity.
2 · Chamber AIM-SGauge output voltageChamber pressure through the AIM-S profile and lifecycle validity gate.
3 · Turbo speedSpeed-related analog voltageA speed indication, independent of the turbo START relay bit.
4 · Arduino VccSupply voltageContext for ADC scaling and the validity of derived measurements.
5 · AIM-S relayReturned 0 / 1 stateArduino-reported control state; not contact or discharge verification.
6 · Chamber APG-MGauge output voltageA second, independent chamber-pressure channel.
7 · Turbo START relayReturned 0 / 1 stateArduino-reported control state; not proof that the pump is rotating.

The current packet carries neither raw ADC counts nor a dedicated quality bit. The browser can flag inconsistent or out-of-range values, but cannot prove every electrical fault from these fields alone. Planned high-voltage divider and current-shunt channels are not part of this documented packet.

Control & Data Acquisition

An Arduino Uno is the hardware-facing acquisition and relay-interface layer. It samples the analog channels, reports control states, and transmits structured telemetry at 9600 baud. The browser is the operator interface and analysis layer. Keeping those roles separate makes it possible to review a recorded run without giving the analysis tools hardware authority.

Telemetry and timing

The reviewed protocol uses newline-terminated, comma-separated values. The Console buffers partial lines, validates numeric fields and relay bits, and rejects malformed packets. Its legacy six-field format omits chamber Pirani voltage; that missing channel remains unavailable rather than being filled with zero.

Baud rate is the communication rate, not the measurement interval. Analysis uses recorded elapsed times and preserves communication gaps instead of assuming every sample arrived on a perfectly uniform schedule.

Commands, feedback, and interlocks

A requested relay state, a returned Arduino bit, and a physically verified contact state are three different things. The Console waits for returned bits that match a request, but those bits cannot verify relay contacts, an ignited gauge discharge, or pump rotation. The speed signal and pressure behavior supply additional context.

The reviewed release requires verified operator authority, explicit control enabling, and fresh telemetry for manual commands. Invalid supply information blocks ON requests. Software interlocks show why commands are unavailable; measurement warnings alone do not actuate relays.

Loss and reconnection

Loss of communication invalidates live evidence and interrupts a recording with a visible gap. Reconnection is explicit, and connecting or reconnecting does not replay relay commands. Equipment state remains uncertain until fresh information is available; a disconnected browser does not imply that hardware is OFF.

These descriptions are grounded in Console 4.4.0. Independent physical protection and electrical verification remain outside what a browser can demonstrate.

AIM-S State Handling

The AIM-S provided a useful example of why a sensor output cannot always be converted directly into a physical quantity. During startup and shutdown, its output passes through intermediate voltages. Applying the pressure table to each transient would create apparent pressure changes that actually reflect instrument state.

The Console uses a lifecycle model in addition to the voltage-to-pressure conversion. Pressure is withheld during transitions while the raw received voltage remains useful for diagnosis. This handles a change in measurement validity; smoothing a pressure curve would not solve the same problem.

AIM-S lifecycle in Console 4.4.0
StateMeaning for pressure
OFFPressure unavailable; the returned relay state and low output are consistent with OFF.
STARTINGPressure withheld while the instrument settles. The reviewed policy requires a 2.5-second blanking interval followed by three consecutive qualifying samples with ON feedback and valid Vcc.
ACTIVEPressure may be displayed only when the signal is within the configured valid range and the remaining validity checks pass.
STOPPINGPressure is invalidated immediately on an OFF request, including while older ON feedback is still arriving. The falling voltage is not treated as a pump-down.

Stale or invalid telemetry also removes pressure validity. An ACTIVE reading is not rejected merely because it resembles a voltage seen during a transition: state, timing, feedback, and signal range are evaluated together. The same lifecycle rules support live acquisition and recorded-data reconstruction.

Configurable AIM-S shutoff

The reviewed Console includes an optional voltage-threshold shutoff that acts only on qualifying ACTIVE serial samples. It requests AIM-S OFF through the existing command path and records the event. Startup and shutdown transients do not qualify. The function needs authorized controls, a running browser, and fresh communication; a sent request is not physical confirmation that the gauge switched off.

Fusor Console

Fusor Console is a browser-based operator, telemetry, and analysis application developed specifically for this project. It connects the live instrument view with recorded runs so that a pressure trend can be reviewed alongside supply information, gauge state, pump indication, and test events.

Documented release
4.4.0 · features checked against the production source archive.

Acquisition & diagnostics

9600 baud Web Serial acquisition, packet validation, connection status, signal diagnostics, and explicit reconnection handling.

Vacuum & system monitoring

Independent foreline APG-M, chamber APG-M, and chamber AIM-S channels; turbo-speed indication, Vcc, and returned relay states.

Gauge state & control status

AIM-S lifecycle handling, configurable voltage-based AIM-S shutoff, operator control locking, and software interlock/status presentation.

Recording & archive

Run recording with local database checkpoints, archived-run inspection, CSV export, and visible interruption or storage-failure states.

Analysis

Pump-down review, selected-interval rate-of-rise analysis, regression, comparisons, and report tools using recorded data.

Events & annotations

System events and run-timeline markers associate configuration changes with samples. Operator annotations remain separate from measured data.

The Console remains a separate application. This portfolio does not open a serial port, issue hardware commands, or publish private browser archives. The application destination is not configured in this portfolio yet.

Release review establishes what the software implements; it is not a report of hardware validation or confirmation of the version deployed on another host. Application screenshots are pending.

Chamber & Mechanical

The documented chamber uses 2.75-inch CF vacuum hardware, with a six-way cross as a major element. Viewports provide optical access; a high-voltage feedthrough and vacuum/instrument interfaces connect the other subsystems. The layout has also incorporated an approximately 12-inch straight CF section with multiple 2.75-inch interfaces.

Why CF hardware

CF, or ConFlat, joints use flange knife edges to deform a metal gasket and form a vacuum seal. Their bolted interfaces support modular assemblies using compatible vacuum components. The 2.75-inch designation refers to flange outside diameter, not chamber bore.

Repeatable assembly still depends on joint condition and correct gasketing. Metal CF gaskets are normally replaced when a joint is opened; modularity does not mean that a used seal can be assumed reusable.

Reference: Kurt J. Lesker Company · CF technical notes

Layout as an engineering variable

Adding a chamber section, moving a gauge, or changing a valve connection affects access, supported mass, gas-flow conductance, and the volume included in a test. The layout has evolved as instruments and pumping arrangements changed. Future drawings need to show which volume is isolated in each measurement configuration.

Mechanical design work also includes transformer-support concepts developed in Fusion 360. A support drawing or printed trial is distinct from verification of load capacity, oil compatibility, or electrical insulation. A verified chamber volume and complete dimensioned assembly are not published here.

Software

The software path runs from Arduino firmware through a serial protocol and Web Serial connection into Fusor Console, then into recording and analysis. Each layer answers a different question: what was sampled, whether it arrived intact, whether it is meaningful, and how it should be displayed or evaluated.

Acquisition contract

Explicit fields and units separate sensor voltage from displayed pressure. The browser does not infer missing chamber data from another sensor. Firmware and browser changes must preserve that contract.

Validity and conversion

Gauge profiles, unit conversions, Vcc context, and AIM-S lifecycle handling are shared with analysis. Invalid measurements produce gaps rather than plausible-looking pressures.

Operator state

Viewing a run, using demo data, and controlling hardware have different authority. Connection, arming, pending requests, and returned states stay visible instead of being collapsed into a single ON/OFF indicator.

Persistence

Recorded samples are checkpointed to the browser’s local database. Storage failures are surfaced. Archives belong to that browser profile and origin; CSV and matching annotation exports provide portable copies.

Continuity

Stale packets, rejected data, disconnects, and interrupted recordings remain visible. The analysis layer uses actual sample times and rejects fits across invalid interior intervals.

Maintainability

The production Console separates protocol parsing, gauge logic, controls, recording, storage, and analysis into native JavaScript modules. Analysis work can use a background worker while sharing the same calculation logic.

The display history and the full-resolution recording serve different purposes. Limiting plotted history keeps the interface manageable without making every screen redraw responsible for the entire run. Local persistence helps recovery, but does not guarantee that the final uncommitted samples survive a crash.

Web Serial depends on browser support and a secure or loopback context. Compatibility with the portfolio page does not imply that a browser can connect to the Arduino.

Experimental Data

The aim of a test record is to connect a measured trend with its configuration and limits. The observations in the vacuum section summarize experience so far; full source runs and formal reports still need to be published.

Pump-down analysis

Review pressure versus elapsed time, changes in slope, instrument transitions, and pump state. Compare runs only after checking starting pressure, prior venting, and configuration.

Rate-of-rise

Select an isolated interval with valid chamber measurements, inspect the slope and fit residuals, and report its units. Treat the result as combined gas-load behavior unless a separate test identifies a leak.

Foreline behavior

Examine backing-pressure changes while the turbo is running. Separate initial chamber roughing from turbo-only backing conditions and record relevant valve changes.

Gauge comparison

Compare signals in their useful overlap and keep each gauge’s location, technology, and validity visible. Disagreement near a range limit is not automatically evidence that one calibration is wrong.

System events

Relate changes in valves, pump commands, gauges, and configuration to the pressure trace. Distinguish automatic software events from manually entered observations.

Uncertainty and gaps

Retain invalid intervals and communication gaps, state gas and calibration assumptions, and avoid reporting more numerical precision than the instruments and test support.

What each experimental record should contain

Date & configuration

Date, software/firmware version, chamber layout, valve configuration, and the purpose of the test.

Starting conditions

Initial pressure, recent venting or pump history, and known changes to chamber condition.

Instruments & timing

Gauge model and location, validity state, units, measurement interval, timestamps, and communication gaps.

Observations & analysis

Source run, selected interval, relevant events, analysis assumptions, uncertainty, and unresolved explanations.

No full test reports published yet.

Source CSVs, dated configurations, instrument context, and analysis notes will accompany future reports. The qualitative observations above remain separate from formal test reports.

Project History

The project has evolved through vacuum-system changes, pump and controller work, added instrumentation, chamber modifications, control revisions, software releases, and troubleshooting. The timeline is intended to connect each change with its reason and the evidence that followed.

Dated entries will be added when their underlying records are ready. No dates have been inferred to fill the timeline.

No history entries published yet.

This section is reserved for dated configurations, modifications, test notes, and the reasons for each change.

Status & Limitations

Active · Under development

This is a student project with working vacuum instrumentation and acquisition software, alongside subsystems and documentation still being developed. Status is tracked at the component and measurement level.

How to read the evidence on this page
Evidence categoryWhat it establishes
Manufacturer specificationA documented component characteristic under the manufacturer’s conditions. It does not establish the assembled system’s measured performance.
Installed hardwareA component identified in the project record. Detailed wiring, interface drawings, and individual photographs may still be incomplete.
ObservationReported behavior under a particular configuration. Full run files and uncertainty may not yet be published.
Design target / planned hardwareAn intended operating condition or subsystem under development. It is not a completed installation or achieved test result.
Verified experimental resultRequires a source record, test conditions, valid instruments, and a stated analysis. No formal fusion or neutron result is published here.
  • Diagrams are conceptual; the as-built piping and electrical records remain incomplete.
  • Pressure indications depend on gauge range, gas, state, and the analog measurement chain. A calibration uncertainty budget has not been published.
  • Vacuum performance changes with configuration, chamber condition, and outgassing. Observed minima are not universal performance specifications.
  • High-voltage development, gas-handling details, and nuclear measurement do not yet have complete public commissioning records.
  • Console behavior is documented against a reviewed release. Software interlocks and returned states do not establish physical protection or device condition.

Project Notes

No project notes published yet.

This section is reserved for build changes, observations, troubleshooting, and software revisions.

Future Work

As-built documentation

Complete the piping and electrical drawings, identify remaining valve and vent components, and add component photographs.

Publish vacuum runs

Attach source CSVs, configurations, valid analysis intervals, and uncertainty notes to pump-down and rate-of-rise reports.

Develop HV measurement

Finalize the supply layout, document component ratings and installed status, and validate divider and shunt measurements before reporting operating performance.

Instrument checks

Record voltage-reference checks, gauge validity, gas assumptions, and the difference between conversion settings and measured calibration.

Maintain software records

Keep the documented Console version aligned with release evidence and preserve exported runs and matching annotations when changing browser or origin.

Nuclear measurement

Document any future neutron-detection method, background measurement, and uncertainty before making a fusion claim. No such result is published here.

Technical References

Manufacturer documents support the component descriptions; they do not certify this installation. Hardware identity, targets, and qualitative observations come from the project record. Software features were checked against the 4.4.0 production source archive.

  1. University of Wisconsin–Madison · IEC operation ↗

    Background on electrostatic acceleration and the IEC arrangement; not evidence about this project.

  2. Lawrence Berkeley National Laboratory · Deuterium fusion products ↗

    Laboratory historical account describing the two D–D branches and the identification of their products.

  3. Edwards · E1M18 / E2M18 instruction manual, A343-10-880 Issue R ↗

    Table 2, printed page 5: E1M18 pumping speed and ultimate-pressure test conditions.

  4. Edwards · Active Pirani Gauge manual, D021-71-885 Issue J ↗

    Manufacturer manual hosted by Ideal Vacuum: APG-M measurement range, gas dependence, and voltage table.

  5. Edwards · AIM-S / SL / X / XL manual, D146-41-880 Issue J ↗

    Manufacturer manual hosted by Artisan: AIM-S principle, pressure range, and gas-dependent conversion. AIM-X equations must not be substituted for AIM-S tables.

  6. Kurt J. Lesker Company · CF technical notes ↗

    Metal-gasket joints, flange nomenclature, and sealing principles.

Console reference: Fusor_Console_4.4_PRODUCTION_RELEASE.zip, including its protocol, gauge lifecycle, interlock, recorder, archive, and analysis modules. Hardware testing was not repeated for this documentation pass.