My work
Hardware integration, control-panel assembly, signal interpretation, Arduino acquisition, Console development, and experimental review.
Inertial Electrostatic Confinement Nuclear Fusor
A continuing student project in system integration, measurement, and testing. The fusor brings together commercial vacuum hardware, a custom control and acquisition setup, and software developed for the experiment.
Hardware integration, control-panel assembly, signal interpretation, Arduino acquisition, Console development, and experimental review.
Documented hardware and software, with qualitative vacuum observations. Full run reports and neutron measurements are not published.
Complete as-built records, publish traceable vacuum tests, and validate the high-voltage supply and its measurement chain.
An inertial electrostatic confinement (IEC) fusor uses an electric field to accelerate positively charged ions through low-pressure gas toward a negatively biased inner electrode, usually a wire grid. The gas is partially ionized: it contains electrons and ions as well as neutral particles. This mixture is a plasma.
The voltage difference between the inner grid and the surrounding chamber or outer electrode accelerates ions inward. Some pass through the grid openings and cross the central region; collisions with other fuel particles can produce fusion. Most particles instead lose energy through other interactions or strike surfaces. A visible glow by itself does not establish that fusion is occurring.
Deuterium is an isotope of hydrogen whose nucleus contains one proton and one neutron. When deuterium is used as fuel, the two principal deuterium–deuterium (D–D) reaction branches are:
D + D → ³He + nHelium-3 nucleus and a neutron
D + D → T + pTritium nucleus and a proton
Neutron detection is commonly used to test for D–D fusion because one branch produces neutrons that can be measured outside the chamber. A credible result needs a suitable detector, background measurements, and an assessment of uncertainty and interference. Electrical readings and photographs of plasma are not substitutes for that evidence.
A small conventional gridded fusor consumes substantially more energy than its fusion reactions release. Grid interception, collisions, and other losses prevent it from serving as a net-energy reactor. Its value here is as an experimental platform connecting plasma physics, vacuum engineering, high voltage, instrumentation, controls, data acquisition, and eventual nuclear measurement.
Reference: University of Wisconsin–Madison · IEC operation · Lawrence Berkeley National Laboratory · Deuterium fusion products
I am developing this IEC fusor as a multi-year engineering project while studying Electrical Engineering Technology. My work brings together vacuum hardware, high-voltage design, analog measurement, Arduino acquisition, browser software, mechanical layout, and experimental testing.
My contribution centers on integrating the subsystems, developing the acquisition and monitoring workflow, comparing instruments, and using tests to understand the behavior of the assembled system. Commercial pumps and gauges provide the underlying hardware; the engineering work is in their interfaces, configuration, measurement, and interpretation.
Development has included changes to the vacuum layout, additional chamber instrumentation, Arduino supply-voltage checks, and software handling of real gauge transitions. High-voltage supply design and its measurement system remain under development. This record separates what is installed or observed from what is still being designed.

E1M18 roughing and backing, 255H turbo with EXDC160, two APG-M gauges, and an AIM-S chamber gauge.
Arduino Uno acquisition and relay interfaces with a separate browser Console. The reviewed software release is 4.4.0.
X-ray-transformer supply architecture and measurements are being developed. The 20–25 kV DC operating goal remains a design target.
No neutron measurements or demonstrated fusion results are published for this project.
The chamber is the common physical interface between vacuum, electrical, and measurement work. The vacuum system establishes the gas environment; the high-voltage supply being developed establishes the intended grid potential. Instruments observe the system, while the Arduino and Console carry those observations into a recorded time history.
Evacuates the chamber and removes gas through roughing and turbo stages. Chamber and backing pressures describe different parts of that process.
The supply being developed is intended to apply a negative potential to the inner grid. Its interfaces include the feedthrough and planned voltage and current measurements.
Converts physical behavior into electrical signals: pressure-gauge outputs, turbo speed indication, and supply-voltage monitoring.
The Arduino samples analog channels, reports relay states, and exchanges telemetry and control requests over serial.
Fusor Console interprets telemetry, displays status, records runs, and supports analysis. It remains a separate application from this portfolio.
CF joints, valves, viewports, feedthroughs, and support structures establish the physical interfaces and constrain access and layout.
The diagram shows functional relationships. It does not specify valve positions, wiring, protective-earth connections, or a completed high-voltage circuit.
The vacuum assembly combines an Edwards E1M18 rotary-vane pump with an Edwards 255H turbomolecular pump driven by an EXDC160. The E1M18 handles initial chamber evacuation and then backs the turbo. An oil trap is included in the foreline. Separate chamber and foreline gauges make it possible to distinguish conditions at the experiment from conditions at the turbo exhaust.
A rotary-vane pump can move the initial gas load toward atmosphere. The E1M18 also keeps the downstream side of the turbo at a suitable backing pressure. Its manufacturer lists a maximum pumping speed of 20.4 m³/h at 60 Hz, approximately 12 CFM, and an ultimate total pressure without gas ballast of 3 × 10⁻² mbar.
Those are pump specifications under stated test conditions. Chamber pressure depends on gas load and the conductance of valves, traps, and connecting pipework, so neither value is a measured performance guarantee for the complete assembly. Foreline pressure with a running turbo is also a different condition from a pump-inlet ultimate-pressure test.
Reference: Edwards · E1M18 / E2M18 instruction manual, A343-10-880 Issue R
The turbomolecular stage transfers momentum to gas molecules and directs them toward its exhaust. It requires a backing pump because it cannot discharge directly to atmosphere in normal high-vacuum service. Excessive foreline pressure reduces the conditions available for compression; pressure and speed therefore need to be considered together.
In this project, the foreline APG-M and turbo speed signal provide that operating context. A START relay indication alone does not show that the turbo has reached speed, and a low chamber indication alone does not establish satisfactory backing conditions.
The two APG-M gauges serve the chamber and foreline during roughing and in the overlap with high-vacuum measurement. Pirani gauges infer pressure from gas-dependent heat transfer. Their sensitivity varies with pressure; indications near their lower limit should not be treated as precise high-vacuum results.
The chamber AIM-S uses an inverted-magnetron, cold-cathode discharge for lower pressures. Its voltage-to-pressure relationship is specific to the AIM-S model. Both gauge technologies have gas-dependent responses, so agreement is only meaningful when location, range, gas, and instrument state are considered.
The chamber gauges remain independent channels. I do not average their readings into a single supposedly more accurate value. Their overlap is useful for checking continuity of the pump-down history and identifying when one instrument has ceased to be the primary measurement.
Reference: Edwards · Active Pirani Gauge manual, D021-71-885 Issue J · Edwards · AIM-S / SL / X / XL manual, D146-41-880 Issue J
Expand a component for its role, status, available specifications, and remaining documentation.
The rotary-vane pump removes the initial gas load from the chamber and maintains the backing pressure needed at the turbomolecular pump exhaust.
Component
Edwards / E1M18
Manufacturer data describe the pump under specified test conditions. They are not a measured base pressure or effective pumping speed for this chamber.
Reference: Edwards · E1M18 / E2M18 instruction manual, A343-10-880 Issue R
The turbomolecular pump transfers gas from the chamber toward the foreline. The E1M18 supports this stage by pumping its exhaust rather than leaving it exposed to atmospheric pressure.
Component
Edwards / 255H
Pump model is documented in the project record. A complete installed-variant specification and measured chamber pumping speed are not published here.
The EXDC160 drives the turbomolecular pump. The acquisition system also monitors its speed-related analog signal alongside pressure and the returned turbo START relay state.
Component
Edwards / EXDC160
Controller wiring and electrical isolation details still require an as-built drawing. Reported START state and measured speed are different quantities.
This gauge observes the foreline between the high-vacuum stage and the backing pump. It provides context for the gas load handled by the E1M18 while the turbo is running.
Component
Edwards / APG-M
The APG-M manual specifies a measurement range of 1 × 10⁻³ to 100 mbar and indications up to atmosphere. Sensitivity and uncertainty vary across the range; a voltage-table endpoint is not an accuracy specification.
Reference: Edwards · Active Pirani Gauge manual, D021-71-885 Issue J
A second APG-M measures at the chamber, allowing its pressure history to be compared with foreline behavior without moving a gauge between locations.
Component
Edwards / APG-M
This remains an independent channel from the chamber AIM-S. A low displayed Pirani value is not sufficient evidence of accurate high-vacuum measurement.
Reference: Edwards · Active Pirani Gauge manual, D021-71-885 Issue J
The AIM-S uses a cold-cathode discharge to infer pressure at substantially lower pressures than the Pirani measurement range.
Component
Edwards / AIM-S
The manufacturer lists 1 × 10⁻⁸ to 1 × 10⁻² mbar for AIM-S/SL. The signal must also be in a valid operating state; startup and shutdown are handled separately in the Console.
Reference: Edwards · AIM-S / SL / X / XL manual, D146-41-880 Issue J
The chamber uses a six-way CF cross, viewports, a high-voltage feedthrough, and instrument and vacuum connections. The documented layout also includes an approximately 12-inch straight CF section with multiple 2.75-inch CF interfaces.
Component
2.75-inch CF assembly
These are project-reported hardware dimensions, not a verified chamber-volume calculation. The project photograph records one configuration; it is not a complete as-built drawing.
The vacuum plumbing allows initial chamber evacuation and a turbo-backed high-vacuum configuration. Isolation allows pressure rise to be observed separately from active pumping.
Valve makes, bore sizes, conductance, and the exact bypass routing are pending an as-built piping drawing.
An oil trap is included in the foreline to limit oil-vapor migration from the rotary-vane pump toward the high-vacuum system.
Trap model, media, maintenance record, and removal efficiency are not documented; its presence does not establish an oil-free chamber.
Venting is part of the vacuum-system layout and must be considered alongside pump isolation and pressure monitoring.
The exact vent hardware and piping arrangement remain pending documentation.
Pressure versus time shows how evacuation changes as the initial gas load falls. The shape of the curve, time spent in a pressure band, gauge transitions, and turbo behavior are more informative than a single minimum reading. Comparisons need similar starting conditions, valve configurations, and gauge-validity rules.
Isolating the chamber from active pumping makes its pressure rise observable. The slope, ΔP/Δt, describes the selected interval. A rising pressure can include external leakage, gas released from internal surfaces, permeation, and gas from trapped volumes. The slope alone cannot identify which mechanism dominates.
With a verified isolated volume and suitable assumptions, volume multiplied by pressure-rise rate can estimate total gas load. A verified chamber volume is not available in this record, so no volumetric leak rate is claimed.
Project notes report the following behavior. These are qualitative summaries of observations, not formal acceptance tests or guaranteed performance. Here, one micron of mercury means 0.001 Torr.
Sub-micron
Reported during high-vacuum operation using the chamber AIM-S.
A project observation, not a calibrated base-pressure specification. A full run file and uncertainty assessment are not published here.
Tens to low hundreds of microns
Representative backing-pressure observations with the turbo operating, depending on test conditions.
Different valve states and gas loads are not equivalent tests. These indications do not establish a pump acceptance limit.
Rate-of-rise tests performed
Pressure rise after isolation has been used to evaluate chamber behavior.
No formal rate or leak throughput is published here without its source interval, instrument validity, and configuration.
Chamber condition, recent exposure to atmosphere, surface contamination, and outgassing can change pump-down and isolated-rise behavior. A slow pump-down is not by itself proof of a leak. Further comparisons need documented starting conditions and source runs; the as-built piping layout and measurement uncertainty also remain to be completed.
How the data is evaluated ↗The high-voltage work is based on an X-ray transformer with two high-voltage secondary sections and a center tap. The intended rectified output is negative at the inner grid. The table separates existing hardware, project-reported ratings, and design work; it does not represent a commissioned supply or an operating procedure.
| Element | Evidence / status | Purpose and constraint |
|---|---|---|
| X-ray transformer | Existing hardware / supply development | Two high-voltage secondary sections with a center tap form the basis of a supply intended to deliver negative DC. A complete as-built power circuit is pending. |
| Primary voltage control | Design architecture | Variac-based adjustment and a proposed step-down stage control primary excitation. Final step-down selection and installation are not established here. |
| Rectifier and ballast | Design in progress | High-voltage diode strings provide rectification; ballast resistance is included between the rectifier and fusor. Final string arrangement, assembly, and load validation remain to be documented. |
| HV feedthrough | Project-reported component rating | Approximately 30 kV. This component rating constrains the design; it does not establish a validated voltage rating for the assembled system. |
| Operating voltage | Design target | Approximately 20–25 kV DC magnitude, negative at the inner grid. 30 kV is an upper design constraint rather than the normal operating target. Sustained operation at this target is not documented. |
| Voltage divider / current shunt | Planned measurement | A high-resistance divider and low-side current shunt have been considered in the design. They are not presented as commissioned channels or completed calibrations. |
| Insulation and oil enclosure | Mechanical / electrical design work | Dielectric-oil immersion, spacing, and mechanical support are part of the insulation approach under development. Final material compatibility and assembled insulation performance remain unverified. |
Primary control and rectification. Adjustable primary excitation allows the transformer input to be controlled. A step-down stage has been considered to obtain a useful adjustment range. Diode strings then convert the secondary AC into the intended DC polarity. Reverse-voltage margin must account for the circuit waveform, transients, and unequal voltage sharing within a series string; adding diode ratings alone does not validate the assembly.
Ballast and measurement. Plasma loading can change sharply. Series ballast is included to limit current and moderate the interaction between the supply and discharge, with voltage drop and heat dissipation as design costs. Voltage and current measurements are needed to distinguish supply behavior from load behavior. A divider or shunt value alone does not establish a calibrated, safely insulated measurement chain.
Insulation and mechanical layout. Clearances, surface paths, terminations, stored energy, and dielectric materials constrain the assembly. Oil immersion is part of the design work, but it does not by itself validate the insulation or remove the need to assess the complete arrangement. The feedthrough rating is one component limit; the assembled system may impose a lower limit.
The measurement chain begins with an instrument, not with a pressure number on a screen. A sensor produces an analog signal; the input interface scales it for the Arduino ADC; firmware converts the sampled result into telemetry; the Console evaluates validity and converts the received signal into an engineering value.
The digital count obtained at the microcontroller input. It is tied to the ADC reference and the conditioned input voltage. It is useful during firmware and signal-chain checks, but is not transmitted in the reviewed seven-field production packet.
ADC voltage refers to the scaled input at the board. Gauge voltage is reconstructed after divider compensation. The Console receives this reconstructed signal voltage; it is not a direct measurement of plasma voltage.
Pressure or speed is calculated from the received voltage and the configured conversion. The conversion must preserve model, units, calibration settings, and invalid or out-of-range states.
Vcc, packet freshness, gauge lifecycle, and returned relay bits provide context. A numeric signal can be present even when a valid pressure measurement is unavailable.
With the Uno ADC referenced to its supply, a fixed input occupies a different fraction of full scale when Vcc changes. Converting counts with an assumed 5.000 V reference can therefore introduce a voltage error. Divider compensation and the gauge conversion then carry that error into the reported engineering value.
I have investigated the effect of the Arduino 5 V rail on the measurement chain. Internal Vcc monitoring helps interpret readings and compare them with external voltage checks. The reviewed firmware/Console contract uses measured Vcc in the firmware conversion, so the browser must not apply that compensation a second time. An internal-reference estimate still has its own uncertainty and is not a substitute for documented calibration.
| Field / channel | Received value | Interpretation |
|---|---|---|
| 1 · Foreline APG-M | Gauge output voltage | Foreline pressure through the APG-M profile; conditioned on signal validity. |
| 2 · Chamber AIM-S | Gauge output voltage | Chamber pressure through the AIM-S profile and lifecycle validity gate. |
| 3 · Turbo speed | Speed-related analog voltage | A speed indication, independent of the turbo START relay bit. |
| 4 · Arduino Vcc | Supply voltage | Context for ADC scaling and the validity of derived measurements. |
| 5 · AIM-S relay | Returned 0 / 1 state | Arduino-reported control state; not contact or discharge verification. |
| 6 · Chamber APG-M | Gauge output voltage | A second, independent chamber-pressure channel. |
| 7 · Turbo START relay | Returned 0 / 1 state | Arduino-reported control state; not proof that the pump is rotating. |
The current packet carries neither raw ADC counts nor a dedicated quality bit. The browser can flag inconsistent or out-of-range values, but cannot prove every electrical fault from these fields alone. Planned high-voltage divider and current-shunt channels are not part of this documented packet.
An Arduino Uno is the hardware-facing acquisition and relay-interface layer. It samples the analog channels, reports control states, and transmits structured telemetry at 9600 baud. The browser is the operator interface and analysis layer. Keeping those roles separate makes it possible to review a recorded run without giving the analysis tools hardware authority.
The reviewed protocol uses newline-terminated, comma-separated values. The Console buffers partial lines, validates numeric fields and relay bits, and rejects malformed packets. Its legacy six-field format omits chamber Pirani voltage; that missing channel remains unavailable rather than being filled with zero.
Baud rate is the communication rate, not the measurement interval. Analysis uses recorded elapsed times and preserves communication gaps instead of assuming every sample arrived on a perfectly uniform schedule.
A requested relay state, a returned Arduino bit, and a physically verified contact state are three different things. The Console waits for returned bits that match a request, but those bits cannot verify relay contacts, an ignited gauge discharge, or pump rotation. The speed signal and pressure behavior supply additional context.
The reviewed release requires verified operator authority, explicit control enabling, and fresh telemetry for manual commands. Invalid supply information blocks ON requests. Software interlocks show why commands are unavailable; measurement warnings alone do not actuate relays.
Loss of communication invalidates live evidence and interrupts a recording with a visible gap. Reconnection is explicit, and connecting or reconnecting does not replay relay commands. Equipment state remains uncertain until fresh information is available; a disconnected browser does not imply that hardware is OFF.
These descriptions are grounded in Console 4.4.0. Independent physical protection and electrical verification remain outside what a browser can demonstrate.
The AIM-S provided a useful example of why a sensor output cannot always be converted directly into a physical quantity. During startup and shutdown, its output passes through intermediate voltages. Applying the pressure table to each transient would create apparent pressure changes that actually reflect instrument state.
The Console uses a lifecycle model in addition to the voltage-to-pressure conversion. Pressure is withheld during transitions while the raw received voltage remains useful for diagnosis. This handles a change in measurement validity; smoothing a pressure curve would not solve the same problem.
| State | Meaning for pressure |
|---|---|
| OFF | Pressure unavailable; the returned relay state and low output are consistent with OFF. |
| STARTING | Pressure withheld while the instrument settles. The reviewed policy requires a 2.5-second blanking interval followed by three consecutive qualifying samples with ON feedback and valid Vcc. |
| ACTIVE | Pressure may be displayed only when the signal is within the configured valid range and the remaining validity checks pass. |
| STOPPING | Pressure is invalidated immediately on an OFF request, including while older ON feedback is still arriving. The falling voltage is not treated as a pump-down. |
Stale or invalid telemetry also removes pressure validity. An ACTIVE reading is not rejected merely because it resembles a voltage seen during a transition: state, timing, feedback, and signal range are evaluated together. The same lifecycle rules support live acquisition and recorded-data reconstruction.
The reviewed Console includes an optional voltage-threshold shutoff that acts only on qualifying ACTIVE serial samples. It requests AIM-S OFF through the existing command path and records the event. Startup and shutdown transients do not qualify. The function needs authorized controls, a running browser, and fresh communication; a sent request is not physical confirmation that the gauge switched off.
Fusor Console is a browser-based operator, telemetry, and analysis application developed specifically for this project. It connects the live instrument view with recorded runs so that a pressure trend can be reviewed alongside supply information, gauge state, pump indication, and test events.
Documented release
4.4.0 · features checked against the production source archive.
9600 baud Web Serial acquisition, packet validation, connection status, signal diagnostics, and explicit reconnection handling.
Independent foreline APG-M, chamber APG-M, and chamber AIM-S channels; turbo-speed indication, Vcc, and returned relay states.
AIM-S lifecycle handling, configurable voltage-based AIM-S shutoff, operator control locking, and software interlock/status presentation.
Run recording with local database checkpoints, archived-run inspection, CSV export, and visible interruption or storage-failure states.
Pump-down review, selected-interval rate-of-rise analysis, regression, comparisons, and report tools using recorded data.
System events and run-timeline markers associate configuration changes with samples. Operator annotations remain separate from measured data.
The Console remains a separate application. This portfolio does not open a serial port, issue hardware commands, or publish private browser archives. The application destination is not configured in this portfolio yet.
Release review establishes what the software implements; it is not a report of hardware validation or confirmation of the version deployed on another host. Application screenshots are pending.
The documented chamber uses 2.75-inch CF vacuum hardware, with a six-way cross as a major element. Viewports provide optical access; a high-voltage feedthrough and vacuum/instrument interfaces connect the other subsystems. The layout has also incorporated an approximately 12-inch straight CF section with multiple 2.75-inch interfaces.
CF, or ConFlat, joints use flange knife edges to deform a metal gasket and form a vacuum seal. Their bolted interfaces support modular assemblies using compatible vacuum components. The 2.75-inch designation refers to flange outside diameter, not chamber bore.
Repeatable assembly still depends on joint condition and correct gasketing. Metal CF gaskets are normally replaced when a joint is opened; modularity does not mean that a used seal can be assumed reusable.
Reference: Kurt J. Lesker Company · CF technical notes
Adding a chamber section, moving a gauge, or changing a valve connection affects access, supported mass, gas-flow conductance, and the volume included in a test. The layout has evolved as instruments and pumping arrangements changed. Future drawings need to show which volume is isolated in each measurement configuration.
Mechanical design work also includes transformer-support concepts developed in Fusion 360. A support drawing or printed trial is distinct from verification of load capacity, oil compatibility, or electrical insulation. A verified chamber volume and complete dimensioned assembly are not published here.
The software path runs from Arduino firmware through a serial protocol and Web Serial connection into Fusor Console, then into recording and analysis. Each layer answers a different question: what was sampled, whether it arrived intact, whether it is meaningful, and how it should be displayed or evaluated.
Explicit fields and units separate sensor voltage from displayed pressure. The browser does not infer missing chamber data from another sensor. Firmware and browser changes must preserve that contract.
Gauge profiles, unit conversions, Vcc context, and AIM-S lifecycle handling are shared with analysis. Invalid measurements produce gaps rather than plausible-looking pressures.
Viewing a run, using demo data, and controlling hardware have different authority. Connection, arming, pending requests, and returned states stay visible instead of being collapsed into a single ON/OFF indicator.
Recorded samples are checkpointed to the browser’s local database. Storage failures are surfaced. Archives belong to that browser profile and origin; CSV and matching annotation exports provide portable copies.
Stale packets, rejected data, disconnects, and interrupted recordings remain visible. The analysis layer uses actual sample times and rejects fits across invalid interior intervals.
The production Console separates protocol parsing, gauge logic, controls, recording, storage, and analysis into native JavaScript modules. Analysis work can use a background worker while sharing the same calculation logic.
The display history and the full-resolution recording serve different purposes. Limiting plotted history keeps the interface manageable without making every screen redraw responsible for the entire run. Local persistence helps recovery, but does not guarantee that the final uncommitted samples survive a crash.
Web Serial depends on browser support and a secure or loopback context. Compatibility with the portfolio page does not imply that a browser can connect to the Arduino.
The aim of a test record is to connect a measured trend with its configuration and limits. The observations in the vacuum section summarize experience so far; full source runs and formal reports still need to be published.
Review pressure versus elapsed time, changes in slope, instrument transitions, and pump state. Compare runs only after checking starting pressure, prior venting, and configuration.
Select an isolated interval with valid chamber measurements, inspect the slope and fit residuals, and report its units. Treat the result as combined gas-load behavior unless a separate test identifies a leak.
Examine backing-pressure changes while the turbo is running. Separate initial chamber roughing from turbo-only backing conditions and record relevant valve changes.
Compare signals in their useful overlap and keep each gauge’s location, technology, and validity visible. Disagreement near a range limit is not automatically evidence that one calibration is wrong.
Relate changes in valves, pump commands, gauges, and configuration to the pressure trace. Distinguish automatic software events from manually entered observations.
Retain invalid intervals and communication gaps, state gas and calibration assumptions, and avoid reporting more numerical precision than the instruments and test support.
Date, software/firmware version, chamber layout, valve configuration, and the purpose of the test.
Initial pressure, recent venting or pump history, and known changes to chamber condition.
Gauge model and location, validity state, units, measurement interval, timestamps, and communication gaps.
Source run, selected interval, relevant events, analysis assumptions, uncertainty, and unresolved explanations.
Source CSVs, dated configurations, instrument context, and analysis notes will accompany future reports. The qualitative observations above remain separate from formal test reports.
The project has evolved through vacuum-system changes, pump and controller work, added instrumentation, chamber modifications, control revisions, software releases, and troubleshooting. The timeline is intended to connect each change with its reason and the evidence that followed.
Dated entries will be added when their underlying records are ready. No dates have been inferred to fill the timeline.
This section is reserved for dated configurations, modifications, test notes, and the reasons for each change.
This is a student project with working vacuum instrumentation and acquisition software, alongside subsystems and documentation still being developed. Status is tracked at the component and measurement level.
| Evidence category | What it establishes |
|---|---|
| Manufacturer specification | A documented component characteristic under the manufacturer’s conditions. It does not establish the assembled system’s measured performance. |
| Installed hardware | A component identified in the project record. Detailed wiring, interface drawings, and individual photographs may still be incomplete. |
| Observation | Reported behavior under a particular configuration. Full run files and uncertainty may not yet be published. |
| Design target / planned hardware | An intended operating condition or subsystem under development. It is not a completed installation or achieved test result. |
| Verified experimental result | Requires a source record, test conditions, valid instruments, and a stated analysis. No formal fusion or neutron result is published here. |
No media in this selection yet.
Project photography and conceptual diagrams are available above. Console screenshots and measured graphs will be added with their source records.
This section is reserved for build changes, observations, troubleshooting, and software revisions.
Complete the piping and electrical drawings, identify remaining valve and vent components, and add component photographs.
Attach source CSVs, configurations, valid analysis intervals, and uncertainty notes to pump-down and rate-of-rise reports.
Finalize the supply layout, document component ratings and installed status, and validate divider and shunt measurements before reporting operating performance.
Record voltage-reference checks, gauge validity, gas assumptions, and the difference between conversion settings and measured calibration.
Keep the documented Console version aligned with release evidence and preserve exported runs and matching annotations when changing browser or origin.
Document any future neutron-detection method, background measurement, and uncertainty before making a fusion claim. No such result is published here.
Manufacturer documents support the component descriptions; they do not certify this installation. Hardware identity, targets, and qualitative observations come from the project record. Software features were checked against the 4.4.0 production source archive.
Background on electrostatic acceleration and the IEC arrangement; not evidence about this project.
Laboratory historical account describing the two D–D branches and the identification of their products.
Table 2, printed page 5: E1M18 pumping speed and ultimate-pressure test conditions.
Manufacturer manual hosted by Ideal Vacuum: APG-M measurement range, gas dependence, and voltage table.
Manufacturer manual hosted by Artisan: AIM-S principle, pressure range, and gas-dependent conversion. AIM-X equations must not be substituted for AIM-S tables.
Metal-gasket joints, flange nomenclature, and sealing principles.
Console reference: Fusor_Console_4.4_PRODUCTION_RELEASE.zip, including its protocol, gauge lifecycle, interlock, recorder, archive, and analysis modules. Hardware testing was not repeated for this documentation pass.